Home >> News Center

Lodhran is receiving a new power transformer

2016-9-6

 Pakistan, Multan: Multan Electric Power Company (MEPCO) is installing a 40 MVA power transformer at the 132 KV Lodhran T-II grid station in order to resolve the complaints of low voltage.

The 40 MVA power transformer is being installed as a replacement for the existing transformer of 20/26 MVA, reports The Balochistan Times.

Source: The Balochistan Times