Product Category
Home >> News Center
125 MVA transformer installed at a Siberian power plant
2017-1-23
Russia, Siberia: Siberian Generating Company has commissioned a new 125 MVA transformer at Tom-Usinsk Power Plant as part of the project to improve the reliability of the largest power plant in Kuzbass.
The new transformer has been installed at Unit 3, which has a capacity of 100 MW, reports Advis.
It replaced the aged equipment which was first put into operation in 1959.
Source: Advis