Teak Electrification Project 0.75–25 MVA
up to 34.5 kV Power Transformers
High-voltage transformer solution for gold mining power infrastructure
Project Overview
CTSS for TEAK Electrification Project
Project Overview The TEAK Electrification Project is an electrical infrastructure project in the Oil & Gas sector, involving the supply of multiple power transformers for medium-voltage and low-voltage power distribution systems.
Power transformer supply for the Teak Electrification Project, covering transformer ratings from 750 kVA to 25 MVA and voltage levels up to 34.5 kV. The supplied transformers include conservator-type and hermetically sealed designs, with OLTC and DETC tap changer configurations and CU/CU windings.
Project Overview
| Project Detail | Specification |
|---|---|
| Project | Teak Electrification Project |
| Equipment | Power Transformers |
| Capacity Range | 750 kVA–25 MVA |
| Maximum Voltage | Up to 34.5 kV |
| Total Quantity | 11 Units |
| Winding | CU/CU (Copper/Copper) |
| Insulating Fluid | Midel 7131 insulating fluid |
| Insulation Specification | CX 350 μm |
| Tap Changers | OLTC / DETC |
| Transformer Designs | Conservator Type / Hermetically Sealed |
Project Equipment Summary
The Teak Electrification Project includes 11 power transformers covering multiple voltage and capacity ratings. The equipment ranges from 750 kVA units to 25 MVA power transformers, supporting different voltage conversion requirements within the project.
| Item | Transformer Specification | Tap Changer | Winding | Quantity | CTSS Power Transformers for This Project |
|---|---|---|---|---|---|
| 1 | 6.9 kV / 34.5 kV, 20/25 MVA power transformer; ONAN/ONAF; conservator type; copper loss below 70 kW | OLTC | CU/CU | 2 | 25 MVA Power Transformer |
| 2 | 34.5 kV / 14.2 kV, 8.5/10.2 MVA power transformer; conservator type | DETC | CU/CU | 2 | 8.5/10.2 MVA Power Transformer |
| 3 | 13.8 kV / 500 V, 3.25 MVA power transformer; hermetically sealed | DETC | CU/CU | 2 | 3.25 MVA Power Transformer |
| 4 | 13.8 kV / 500 V, 1.5 MVA power transformer; hermetically sealed | DETC | CU/CU | 3 | 1.5 MVA Power Transformer |
| 5 | 13.8 kV / 500 V, 750 kVA power transformer; hermetically sealed | DETC | CU/CU | 2 | 750 kVA Power Transformer |
| Total | 11 | 11 Units | |||
Insulation & Transformer Design
| Design Parameter | Specification |
|---|---|
| Insulation / Fluid | Midel 7131 insulating fluid |
| Insulation Specification | CX 350 μm |
| Winding | CU/CU copper windings |
| Transformer Types | Conservator Type / Hermetically Sealed |
| Tap Changers | OLTC / DETC |
| Total Quantity | 11 Power Transformers |
Technical Highlights
Transformer capacity range from 750 kVA to 25 MVA
Voltage levels up to 34.5 kV
20/25 MVA ONAN/ONAF conservator-type power transformers
OLTC and DETC tap changer configurations
CU/CU copper winding construction
Conservator-type and hermetically sealed transformer designs
Midel 7131 insulating fluid
CX 350 μm insulation specification
Total supply: 11 power transformers
Project Summary
The Teak Electrification Project demonstrates the supply of a diversified range of power transformers for medium- and high-capacity electrical applications. The 11 supplied units cover ratings from 750 kVA to 25 MVA, with voltage configurations including 13.8 kV/500 V, 34.5 kV/14.2 kV, and 6.9 kV/34.5 kV.
The transformer portfolio combines conservator-type and hermetically sealed construction with OLTC and DETC tap changers. All listed units feature CU/CU windings, while the project specifications include Midel 7131 insulating fluid and CX 350 μm insulation.
Teak Field Electrification Project – Trinidad & Tobago
Project Overview
The Teak Field Electrification Project is part of Perenco Trinidad & Tobago’s revitalization program across the Teak, Samaan and Poui (TSP) fields, located offshore on the southeast coast of Trinidad and Tobago.
The modernization program was designed to improve production efficiency, operational safety and the long-term sustainability of these mature offshore oil and gas assets.
As part of the electrification works, a new high-voltage electrical network was established from the Macarius power hub to Teak Echo and across the Teak satellite platforms, using approximately 28 km of subsea electrical cables.
The project also included the installation of nine new transformers and five new electrical shelters on the offshore platforms. These high-voltage electrical systems support safer and more efficient offshore operations.
The TSP fields are mature producing assets. Trinidad and Tobago’s Ministry of Energy records commercial offshore production from the East Coast beginning in 1972 from Amoco’s Teak Platform, while industry/project sources describe the TSP fields as having been in production for decades.
Looking for a Power Transformer for Your Oil & Gas Project?
CTSS provides customized high-voltage power transformer solutions for Oil & Gas, industrial and infrastructure applications.