| High-voltage rated voltage | 110kV / 220kV / 330kV / 500kV, customizable | Low-voltage rated voltage | 10.5kV – 27kV, typical; custom voltages available |
|---|
| Rated capacity | 30MVA – 800MVA; larger-capacity units customizable | Power Supply Mode | Generator-connected, generator terminal connection |
|---|
| Frequency | 50Hz; 60Hz customizable for overseas projects | Cooling Type | ONAF / OFAF / ODAP forced-oil-circulation cooling |
|---|
| Vector Group | YNd11, YNd and other custom configurations | Short-circuit Impedance | Custom-designed according to power-plant system-protection coordination requirements |
|---|
| No-load Current | <0.25% – 0.50%, measured at rated voltage | Tap-changer | Off-circuit tap-changer standard; OLTC optional |
|---|
| Insulation Level | Compliant with IEC 60076-3 and GB 1094 series | Ambient Conditions | -40°C to +40°C; high-altitude, coastal anti-corrosion and extreme-cold versions customizable |
|---|
| Transformer Type | Generator step-up transformer, oil-immersed power transformer | Typical Model | 240MVA, 220kV / 15.75kV generator step-up transformer |
|---|
| Generator-side Voltage | 15.75kV in typical application profile | Grid-side Voltage | 220kV in typical application profile |
|---|
| Typical Cooling Arrangement | ONAF oil-natural-air-forced cooling | Anti-corrosion Grade | C3, C4, C5, CX-H |
|---|
| Partial-discharge Level | <100pC at 1.5 x rated voltage | Noise Level | Typical ≤68dB(A) at 1m; low-noise version available |
|---|
| Short-circuit Withstand | Designed and structurally reinforced according to IEC 60076-5; winding dynamic-force safety margin >1.3 x calculated values | Thermal Performance | Temperature rise compliant with IEC / GB standards; thermal margin reserved for cyclic variable generator loads |
|---|
| Over-excitation Capability | Enhanced design for generator-unit over-excitation transient events | Design Life | ≥30 years under normal power-plant operating conditions |
|---|
| Insulation & Fluid | Mineral insulating oil; high-fire-point biodegradable ester fluid optional | Dielectric Fluid | Mineral oil or high-fire-point biodegradable ester fluid |
|---|
| Tank Construction | Conservator-equipped or fully-sealed tank construction | Tank Tightness Test | Positive-pressure and negative-pressure tightness testing |
|---|
| Tank Weld Inspection | All tank welds inspected and tested | Core Material | High-permeability low-loss grain-oriented silicon steel |
|---|
| Core Joint Technology | Five-step stepped-lap fully-mitered-joint construction | Core Clamping | Reinforced core-clamping structure |
|---|
| Conductor | Advanced conductor transposition scheme | Winding Structure | Optimized winding structure with enhanced mechanical clamping |
|---|
| Winding Insulation | Upgraded main-and-minor insulation system for transient over-voltage conditions | Drying Process | Multi-stage vacuum drying |
|---|
| Impregnation Process | Hot-oil impregnation | Partial-discharge Control | Strict partial-discharge control during manufacturing |
|---|
| Bushing Assembly | High-reliability bushing assembly | Pressure Relief | Pressure-relief valve |
|---|
| Oil-level Monitoring | Oil-level indicator | Gas Protection | Gas-relay protection |
|---|
| Winding Temperature Monitoring | PT100 winding temperature sensors | DGA Monitoring | DGA dissolved-gas-in-oil online monitoring system optional |
|---|
| Electromagnetic Design | 3D finite-element modelling with stray-loss and additional-loss analysis | Mechanical Design | ANSYS structural simulation and dynamic-force verification |
|---|
| Short-circuit Simulation | Transient magnetic-field simulation for winding stress, deformation and clamping-system performance | Insulation Coordination | Electric-field-distribution simulation with lightning-impulse and switching-impulse verification |
|---|
| Thermal-flow Simulation | CFD oil-flow simulation and cyclic hot-spot-temperature prediction | Seismic Design | Seismic and mechanical-strength verification; IEEE 693 optional |
|---|
| Over-excitation Design | Magnetic-density control and over-excitation capability verification | Generator-side Adaptability | Designed for frequent load fluctuation, unit start-stop inrush current and over-excitation conditions |
|---|
| Generator-side Short-circuit Adaptability | Enhanced winding mechanical strength for generator-source short-circuit conditions | Harmonic Adaptability | Designed to reduce additional losses caused by harmonic currents and leakage flux |
|---|
| Applicable Standard | IEC 60076-1 / 2 / 3 / 5 | Application Guide | IEC 60076-8 |
|---|
| Chinese Standard | GB 1094 series | Technical Standard | GB/T 6451 |
|---|
| North American Standard | IEEE C57.12.00 / C57.12.90 | Seismic Standard | IEEE 693 optional for high-seismic-zone power plants |
|---|
| Environmental Compliance | RoHS / REACH | Dielectric Fluid Compliance | EPA 40 CFR Part 761; PCB-free dielectric fluid |
|---|
| Oil System | Conservator-equipped or fully-sealed configuration | Cooling Configuration | ONAF / OFAF / ODAP for large-capacity GSU units |
|---|
| Tap-changer Configuration | Off-circuit tap-changer or OLTC according to power-plant requirements | Special Options | DGA online monitoring system and high-fire-point dielectric fluid |
|---|
| Coastal Adaptation | C5-M heavy-duty anti-corrosion coating optional | High-altitude Adaptation | Custom design available |
|---|
| Extreme-cold Adaptation | Custom versions available for extreme-cold power-plant sites | High-temperature Adaptation | Thermal margin optimized for cyclic variable generator-load conditions |
|---|
| Factory Acceptance Testing | Insulation test, partial-discharge test, temperature-rise test, noise-level test, ratio test and impedance measurement | Witness Testing | Client or third-party witnessed testing available |
|---|
| Short-circuit Test | Special destructive type test performed by authorized third-party institutions | Test Documentation | Full type-test reports, simulation reports, component certificates and material traceability documents |
|---|
| Installation Support | Installation guidance and commissioning supervision | Commissioning Support | Post-commissioning performance verification under actual generator-loaded conditions |
|---|
| Warranty | Comprehensive product warranty; extended service agreement optional | Spare Parts Supply | Minimum 25-year spare-parts supply for key components |
|---|
| Training | On-site or remote operation and maintenance training | Quality Management | ISO 9001 / ISO 14001 / ISO 45001 certified manufacturing facilities |
|---|
| Typical Application | Coal-fired power plants and gas combined-cycle power plants | Hydro Application | Hydro-power and pumped-storage power stations |
|---|
| Renewable Energy Application | Large-scale centralized new-energy power-generation bases | EPC Application | Overseas thermal, hydro and combined-cycle power-plant EPC projects |
|---|